Fault Codes:Hitachi ZH200LC-5A 11008-2
What is Hitachi ZH200LC-5A Fault Code 11008-2?
Hitachi ZH200LC-5A Fault Code 11008-2 means "Communication abnormality of the (main control valve) information controller 2." The controller that handles main control valve data is not exchanging signals correctly with the rest of the machine's CAN network.
The ZH200LC-5A hybrid excavator relies on several linked controllers, including the main controller (MC), ECM, and information controllers. If one drops off the network, valve control and monitoring can be compromised. This is why the code should be resolved before the machine returns to work.
Common Symptoms
- Fault code and warning message shown on the monitor.
- Slow, weak, or jerky boom, arm, bucket, or swing response.
- Reduced engine or pump output (derate) in some conditions.
- Intermittent fault that clears after a key cycle and then returns.
- Other communication codes appearing alongside 11008-2.
Potential Causes
- Chafed, cracked, or pinched CAN harness near the control valve, boom foot, or frame clamps.
- Corrosion or water ingress in connectors, with bent or pushed-back pins.
- Low battery voltage, poor ground connections, or a blown fuse feeding the controller.
- Open or short circuit on CAN-H/CAN-L, or a missing or failed terminating resistor.
- Poor aftermarket wiring repairs, which are common on used machines.
- Internal failure of the information controller, which is the least likely cause.
How to Troubleshoot and Fix Code 11008-2
Step 1: Prepare safely. Park the machine, lower the attachment, and switch off the engine. The ZH200LC-5A is a hybrid, so follow Hitachi's high-voltage precautions before touching any hybrid system wiring.
Step 2: Check power and grounds. Use a multimeter to confirm healthy battery voltage on the 24 V system. Inspect the fuses and ground points for the controller circuit. Clean and tighten any loose or corroded terminals.
Step 3: Read the code. Connect Hitachi Dr. ZX diagnostic software. Record the code, clear it, and see whether it returns immediately (active) or only intermittently (history).
Step 4: Inspect the harness. On used excavators, previous wear is the first thing to check. Look for harness friction, melted loom, loose clamps, corrosion, and old splices before replacing any part.
Step 5: Test the CAN circuit. With power off, check continuity and resistance on CAN-H and CAN-L using the wiring diagram for your serial number. A healthy bus typically reads about 60 Ω between the two lines, from two 120 Ω terminators. Also check for shorts to ground or voltage.
Step 6: Reseat and repair. Disconnect and inspect the information controller connectors. Repair damaged wires with sealed splices and apply dielectric grease to the connectors.
Step 7: Replace only if proven faulty. If power, ground, and wiring all test good, suspect the controller. Confirm with a known-good unit and Hitachi service data, since replacement may require programming.
After repairs, clear the code and run the machine through a full hydraulic function test.
Disclaimer: This guide is for informational purposes only. Always follow the official Hitachi service manual and consult a qualified heavy equipment technician, especially when working on hybrid high-voltage systems.
Fault Description:
Communication abnormality of the (main control valve) information controller 2
FairTradeMachinery
You Design the Vision. We Handle the Hard Parts.
Helping Global Buyers Access Better-Value Machinery and After-Sales Solutions.
As China's Leading Global Used Machinery Exchange Platform, we sits at the intersection of IoT technology and B2B commerce. That means real-time inventory data, verified seller profiles, and a transaction process designed for cross-border buyers who can't always inspect machines in person. Our users in China have exceeded 1.5 millions meaning we have the first source of excavator owners and the equivalent number of machines. This means we can cover all the popular models and even specific needs, no matter of the status.







FAQs
WhatsApp