








Product Description
Strengthen your excavator fleet with this proven 2010 Kobelco SK200超8, currently located in Ganzhou, Jiangxi. Built during Kobelco's renowned Super 8 series production era, this 20-ton class machine delivers the operational redundancy that keeps project timelines on track when primary equipment faces maintenance downtime or concurrent job demands.
- Immediate deployment capability for multi-site contractors managing overlapping schedules
- Kobelco's fuel-efficient hydraulic system reduces standby operating costs
- Proven SK200 platform simplifies operator transition and parts inventory management
- Ideal capacity range for utility work, foundation prep, and medium-scale earthmoving
Fleet managers recognize the SK200超8 as a strategic asset that prevents costly project delays caused by equipment bottlenecks. This unit provides the operational insurance that separates prepared contractors from those scrambling for rental solutions during peak season. Available now in Ganzhou for immediate inspection and acquisition.
| Specifications | Value |
|---|---|
| No. | 1034340 |
| Tonnage (tons) | 20 |
| Working weight (kg) | 20600 |
| Bucket capacity (m³) | 0.8 |
| Rod length (mm) | 2.94(Standard) |
| Country of origin | Hangzhou |
| power | Traditional power |
| manufacturer | Joint venture/Import |
| bucket | backhoe |
| Engine type | Hino J05E |
| Rated power (kw/rpm) | 114/2000 |
| Cooling mode | water-cooling |
| Cylinder diameter × stroke (mm) | 112 x 130 |
| Number of cylinders (PCS) | 4 |
| Displacement (L) | 5.123 |
| Working form | Direct injection, four stroke, turbocharged, built-in intercooling |
| Ground specific pressure (Kpa) | 46 |
| Rotation speed (rpm) | 12.5 |
| Climbing ability (%) | 70/35 ° |
| Bucket digging force (kN) | 143 |
| Rod digging force (kN) | 102 |
| Travel speed (km/h) | 3.6/6.0 |
| Maximum flow of main pump (l/min) | 2 x 220 + 20 |
| Traveling Hydraulic Circuit (Mpa) | 34.3 |
| Rotary Hydraulic Circuit (Mpa) | 29 |
| Control Hydraulic Circuit (Mpa) | 5 |
| Hydraulic crushing pipeline is standard | is |
| Main pump type | Dual variable displacement axial piston pump ×2+ pilot gear pump ×1 |
| Working Hydraulic Circuit (Mpa) | 34.3 |
| Bucket cylinders - Number × diameter × stroke (mm) | 120 x 1080 |
| Bucket rod cylinders - Number × diameter × stroke (mm) | 135 x 1558 |
| Boom cylinders - Number × diameter × stroke (mm) | 120 x 1355 |
| Fuel Tank (L) | 370 |
| Hydraulic Tank (L) | 146 |
| Engine Oil changes (L) | 22 |
| Coolant (L) | 22 |
| Total transport length (mm) | 9450 |
| Total transport width (mm) | 2800 |
| Total transport height (mm) | 2980 |
| Counterweight ground clearance (mm) | 1060 |
| Minimum ground clearance (mm) | 450 |
| Minimum turning radius of front working device (mm) | 3540 |
| Back end turning radius (mm) | 2750 |
| Total track length (mm) | 4170 |
| Track gauge (mm) | 2200 |
| Track plate width (mm) | 600 |
| Total track width (mm) | 2800 |
| Track ground length (mm) | 3370 |
| Maximum digging radius (mm) | 9900 |
| Maximum digging depth (mm) | 6700 |
| Maximum excavation height (mm) | 9720 |
| Maximum unloading height (mm) | 6910 |
| Maximum vertical digging depth (mm) | 6100 |
| Bulldozer lift or depth (mm) | No bulldozer |
| Dodging plate width × height (mm) | No bulldozer |
| Maximum excavation radius of stop surface (mm) | 9730 |
| Maximum effective digging depth (mm) | 6520 |
WhatsApp
Facebook










FAQs
WhatsApp