








Product Description
Available now in Guizhou, this 2019 XCMG XE155D crawler excavator eliminates factory lead times and accelerates your project timeline. Powered by a QSF3.8 turbocharged engine delivering 93kW at 2200rpm, this 15-ton machine combines reliable performance with immediate deployment capability. Fast-track your operations with a unit that's inspection-ready and positioned for rapid mobilization to your worksite.
- Operating Weight: 14,600 kg with 0.61m³ bucket capacity
- Digging Performance: 8,304mm maximum reach, 5,535mm maximum depth, 106.9kN bucket force
- Engine: QSF3.8 water-cooled, 4-cylinder, 3.8L displacement, 500N·m torque
- Hydraulics: 260L fuel tank, 105L hydraulic reservoir for extended operation
- Mobility: 5.2km/h travel speed, 35% grading ability, 2,325mm rear turning radius
- Dimensions: 7,795mm transport length, 2,590mm width, 600mm track width
- Location: Guizhou, China – ready for immediate inspection and shipment
Skip months of factory waiting. Secure this proven XCMG excavator and put it to work while competitors are still placing or
| Specifications | Value |
|---|---|
| No. | 1024250 |
| Tonnage (tons) | 15 |
| Working weight (kg) | 14600 |
| Bucket capacity (m³) | 0.32-0.71 (0.61) |
| Boom length (mm) | 4600 |
| Rod length (mm) | 2520 |
| power | Traditional power |
| manufacturer | Made in China |
| bucket | backhoe |
| Engine type | QSF3.8 |
| Rated power (kw/rpm) | 93/2200 |
| Cooling mode | water-cooling |
| Maximum torque (N.m) | 500/1300 |
| Number of cylinders (PCS) | 4 |
| Displacement (L) | 3.8 |
| Working form | Efi, 4-stroke, turbocharged, air-to-air cold |
| Ground specific pressure (Kpa) | 37 |
| Rotation speed (rpm) | 11 |
| Climbing ability (%) | 35 |
| Bucket digging force (kN) | 106.9 |
| Rod digging force (kN) | 73.4 |
| Maximum tractive force (kN) | 134 |
| Travel speed (km/h) | 5.2/2.9 |
| Fuel Tank (L) | 260 |
| Hydraulic Tank (L) | 105 |
| Engine Oil changes (L) | 11 |
| Total transport length (mm) | 7795 |
| Total transport width (mm) | 2590 |
| Total transport height (mm) | 2900 |
| Counterweight ground clearance (mm) | 948 |
| Minimum ground clearance (mm) | 477 |
| Minimum turning radius of front working device (mm) | 2445 |
| Back end turning radius (mm) | 2325 |
| Total track length (mm) | 3658 |
| Track gauge (mm) | 1990 |
| Total track width (mm) | 600 |
| Maximum digging radius (mm) | 8304 |
| Maximum digging depth (mm) | 5535 |
| Maximum excavation height (mm) | 8649 |
| Maximum unloading height (mm) | 6185 |
| Maximum vertical digging depth (mm) | 4697 |
see more
WhatsApp
Facebook











