Product Description
Built for demanding excavation work, this 2018 XCMG XE200DA delivers 20-ton performance with operator-centered engineering. Powered by a QSB7 engine producing 135 kW at 2050 rpm, it combines 740 N·m of torque with responsive hydraulic controls for precise material handling across construction and earthmoving applications.
Operators benefit from exceptional visibility thanks to the elevated cabin design and strategically positioned counterweight, enabling confident maneuvering around obstacles. The machine's 46.9 kPa ground pressure and 11.6 rpm rotation speed provide stable operation on varied terrain, while dual travel speeds (5.3/2.9 km/h) allow quick repositioning between dig zones.
Key working parameters include:
- Maximum digging reach: 9790 mm with 6460 mm depth capability
- Bucket capacity: 0.93 m³ with 149 kN digging force
- Working weight: 21,200 kg for enhanced stability
- 400L fuel tank supporting extended shifts
- 35% grading ability for slope work
Currently located in Fuzhou, Fujian, this China-manufactured excavator offers proven XCMG reliability for contractors requiring dependable mid-size excavation capacity.
| Specifications | Value |
|---|---|
| No. | 1044125 |
| Tonnage (tons) | 20 |
| Working weight (kg) | 21200 |
| Bucket capacity (m³) | 0.93 |
| Boom length (mm) | 5680 |
| Rod length (mm) | 2710 |
| power | Traditional power |
| manufacturer | Made in China |
| bucket | backhoe |
| Engine type | QSB7 |
| Rated power (kw/rpm) | 135/2050 |
| Maximum torque (N.m) | 740/1250 |
| Number of cylinders (PCS) | 6 |
| Displacement (L) | 6.7 |
| Ground specific pressure (Kpa) | 46.9 |
| Rotation speed (rpm) | 11.6 |
| Climbing ability (%) | 35 |
| Bucket digging force (kN) | 149 |
| Rod digging force (kN) | 121 |
| Maximum tractive force (kN) | 184 |
| Travel speed (km/h) | 5.3/2.9 |
| Fuel Tank (L) | 400 |
| Hydraulic Tank (L) | 220 |
| Engine Oil changes (L) | 24 |
| Total transport length (mm) | 9625 |
| Total transport width (mm) | 2900 |
| Total transport height (mm) | 3100 |
| Counterweight ground clearance (mm) | 1050 |
| Minimum ground clearance (mm) | 486 |
| Maximum digging radius (mm) | 9790 |
| Maximum digging depth (mm) | 6460 |
| Maximum excavation height (mm) | 9680 |
| Maximum unloading height (mm) | 6815 |
| Maximum vertical digging depth (mm) | 5590 |