








Product Description
This 2020 Doosan DH210W-7 wheeled excavator offers the mobility and versatility required for urban construction, road maintenance, and infrastructure projects. Currently located in Shanxi, China, this machine combines Doosan's proven reliability with the operational flexibility of a wheeled undercarriage, allowing rapid transit between job sites without transport equipment.
Key features include:
- Wheeled configuration for enhanced mobility and road travel capability
- Doosan DL06 engine delivering efficient power and fuel economy
- Spacious operator cabin with ergonomic controls and improved visibility
- Hydraulic system engineered for smooth operation and precise control
- Suitable for utility work, municipal projects, and material handling applications
The DH210W-7 represents a practical solution for contractors requiring a mobile excavator that can operate across multiple sites efficiently. Inspection welcomed.
| Specifications | Value |
|---|---|
| No. | 1169457 |
| Tonnage (tons) | 20 |
| Working weight (kg) | 19800 |
| Bucket capacity (m³) | 0.86 |
| Boom length (mm) | 5700 |
| Rod length (mm) | 2900/2400 |
| Country of origin | Yantai, China |
| power | Traditional power |
| manufacturer | Joint venture/Import |
| bucket | backhoe |
| Engine type | DB58TIS |
| Rated power (kw/rpm) | 115 / 2200 |
| Total displacement (L) | 5.785 |
| remark | Four-stroke, water-cooled, direct spray |
| Cylinder diameter × stroke (mm) | 102 x 118 |
| Maximum torque (N.m) | 60 |
| Number of cylinders (PCS) | 6 |
| Forward speed (Km/h) | 35 / 9.3 |
| Rotation speed (rpm) | 12.2 |
| Climbing ability (%) | 59.6% (30.8°) persisted |
| Bucket digging force (kN) | 148 |
| Rod digging force (kN) | 104 |
| Minimum turning radius (m) | 3.6 |
| Driving form | Hydraulic drive |
| Maximum flow of main pump (l/min) | 2 x 239 |
| Traveling Hydraulic Circuit (Mpa) | 33.6 |
| Rotary Hydraulic Circuit (Mpa) | 27 |
| Main pump type | Variable axial plunger pump |
| Working Hydraulic Circuit (Mpa) | Standard 30.8/ Supercharged 33.6 |
| Pilot pump flow (L/min) | 22.1 |
| Fuel Tank (L) | 350 |
| Hydraulic Tank (L) | 118 |
| Total transport length (mm) | 9524 |
| Total transport width (mm) | 2470 |
| Total transport height (mm) | 3608(to top of arm) |
| Full cab height (mm) | 3111 |
| Counterweight ground clearance (mm) | 1254 |
| Wheelbase (mm) | 2850 |
| Single tire width (mm) | 596 |
| Total tire outside width (mm) | 2470 |
| Wheel base (mm) | 1874 |
| Minimum ground clearance (mm) | 340 |
| Back end turning radius (mm) | 2750 |
| Maximum digging radius (mm) | 9896 |
| Maximum excavation radius (mm) | 9694/9363 |
| Maximum digging depth (mm) | 6558 |
| Maximum excavation height (mm) | 9673 |
| Maximum unloading height (mm) | 6823 |
| Maximum vertical digging depth (mm) | 5865 |
| Minimum turning radius (mm) | 2750 |
see more
WhatsApp
Facebook










FAQs
WhatsApp