What is Kobelco SK135SRLC-2 Fault Code P0202?

P0202 means the engine ECM has detected an open circuit — a disconnection — in the solenoid valve circuit feeding injector 2.

On the SK135SRLC-2, each electronically controlled injector is fired by a dedicated driver inside the engine ECM through a two-wire circuit. The ECM watches the current ramp on every injection pulse; when no current flows on the cylinder 2 driver, it logs P0202 and flags that injector as disconnected.

This matters because a dead cylinder on a 13-tonne excavator is not just a rough idle. Unburnt fuel washes cylinder walls, the ECM pulls torque to protect the engine, and the hydraulic system loses the rpm headroom it needs under load.

Common Symptoms

  • Check engine lamp illuminated with P0202 stored or pending.
  • Rough, loping idle and audible misfire, often with white or grey smoke.
  • Derate mode — sluggish boom, slow travel, poor digging force.
  • Hard starting, or stalling when the hydraulics load the engine at low rpm.
  • Excess vibration and fuel knock from the affected cylinder.

Potential Causes

  • Harness chafe at the valve cover grommet, the injector cover, and where the engine loom passes the pump coupling — common rub points on high-hour machines.
  • Corroded, pushed-back or water-ingressed pins in the injector connector.
  • Failed injector solenoid (open coil) from heat cycling or contamination.
  • Damaged internal injector harness or loose hold-down under the valve cover.
  • ECM driver failure — diagnose this last, not first.

How to Troubleshoot and Fix Code P0202

Step 1 — Inspect before you test. Key off, disconnect the battery. Trace the cylinder 2 injector harness end to end. Look for rubbed insulation, stretched wires, green corrosion, and loose connector locks. On used excavators, this visual pass finds the fault more often than any meter reading.

Step 2 — Resistance check. Unplug the injector and measure across its two terminals with a multimeter. Compare the reading to injector 1 or 3. An open circuit (OL) or a large deviation confirms a failed solenoid.

Step 3 — Circuit integrity. With the ECM connector removed, ohm each injector wire from end to end. Anything above about 1 Ω points to a corroded splice or chafed conductor. Check each leg to ground for short-to-earth.

Step 4 — Supply and signal. Reconnect, key on, and confirm reference voltage at the injector plug. Use OEM diagnostic software to run a cylinder cut-out or contribution test and verify the driver is commanding.

Step 5 — Repair and verify. Repair the harness with sealed splices and proper loom standoff, or replace the injector, then clear the code and confirm it does not return under load.

This guide is for reference only. Confirm procedures against the Kobelco service manual for your serial number, and consult a qualified heavy diesel technician before replacing major components.

Fault Description:

The solenoid valve system of injector 2 is disconnected

FairTradeMachinery

You Design the Vision. We Handle the Hard Parts.

Helping Global Buyers Access Better-Value Machinery and After-Sales Solutions.

As China's Leading Global Used Machinery Exchange Platform, we sits at the intersection of IoT technology and B2B commerce. That means real-time inventory data, verified seller profiles, and a transaction process designed for cross-border buyers who can't always inspect machines in person. Our users in China have exceeded 1.5 millions meaning we have the first source of excavator owners and the equivalent number of machines. This means we can cover all the popular models and even specific needs, no matter of the status.

facebookyoutubeinstagramtiktoklinkedinreddit
Contact us
Contact us
faqsFAQsWhatsAppWhatsApp